| Welded Rail Trains | |||
|
Info/Photo/Archive: Jay Bendersky |
![]() |
![]() |
|
|
Welded rail train eastward thru Hicksville Station,
Track 3, with Ol' Glories MP15ACs 150/158 doing the honors..."SERVING WITH PRIDE"!! - 11/20/2019 Photo/Archive: Paul Pesante |
|||
![]() |
![]() |
![]() |
|
| The Rail train transports Continuous Welded Rail segments. Today's job is to creep along the Central Branch at walking pace while the puller runs the rail off the rack and the track crew spikes the ribbons in place. Keep up a good pace otherwise its extra work to set up for the next crew which is the Track Laying Machine. Info/Photos/Archive: Jason Baxter - 8/12/2020 | |||
![]() Welded Rail Train preparing to stop at Queens Interlocking while an eastbound M7 crosses over at Floral Park. 3/27/2021 Photo/Archive: Craig Lignelli |
![]() Today's rail train eastbound with NYAR GP38-2 #261 and MP15AC #159 power passing Mineola station. 4/17/2021 - Photos/Archive: Thomas Farmer |
||
![]() |
![]() |
![]() |
|
|
Day 2 of the RS90 working the Rail Train, this time
between Mineola and Hicksville. Ellison Ave. bridge, Westbury (left) - RS90 eastbound passing Carle Place 4/18/2021 - Photo/Archive: Daniel Foran |
LIRR #152 sitting on the Wellwood DEF (double-ended
freight track)
with the welded rail train, waiting for a crew to take the train west.
9/02/202 Photo/Archive: Daniel Foran |
MP15AC #150 with three MP15AC units train "tied up" at Wellwood siding with a welded rail train 4/02/2026 - Photo/Archive: Eric Kerper | |
![]() |
![]() |
||
| Single Tracking For Rails. A pair of MTA LIRR Trains pass the Rail Train near Bayside, NY on Saturday, 5/22/2021. The rail train was dropping welded rail between Little Neck and Bayside as part of ongoing work projects on the Port Washington Branch. By using welded rail, the need for maintenance is significantly reduced and the ride is much smoother. Info/Photos/Archive: Marc Glucksman - River Rail Photo | |||
![]() View east along Track 1. In the foreground, this was old Track 2. 5/21/2022 - Photo/Archive: Jeff Erlitz |
|
![]() Rolling new welded rail into place at Mineola this morning. 7/11/2022 - Photo/Archive: John Krattinger |
|
|
|
|||
![]() New Ebenezer Drop Ends 65' gondola #6208 2/2024 - Photo/Archive: Barry Johnson |
![]() New Ebenezer Drop Ends 65' gondola #6205 2/2024 - Photo/Archive: Barry Johnson |
![]() The #166 sits uncoupled from a train of brand new open-end gondolas, #6205, brought out to AH in advance of trackwork on the mainline in Calverton. 3/03/2024 - Photo/Archive: Ronnie Schnepf |
![]() MP15AC #165 at RMLI, Riverhead rail reclaim 3/28/2024 Photo/Archive: Daniel Foran |
![]() MP15AC #165 with rail train pulling into Riverhead. 3/23/2024 Photos/Archive: Kenny Reichel |
![]() Backing down the freight line 3/23/2024 |
![]() Welded rail train passing Jamaica 11/04/2024 Photo/Archive: Leonard Wilson |
![]() MP15AC #163, #160 MOW eastbound on Track 1, Mineola - 7/26/2024 Photo/Archive: John Ciesla |
![]() |
|
||
|
On a foggy March 31st, 2025, Long Island Rail Road
Extra 172, with MP15AC 172, towed a short gondola rail train from MO
(Moriches) to Holban Yard via the Montauk Line. Here the westbound
train is crossing the Forge River. Later, further west passing West
Islip and, at right, approaching Lynbrook station. Photo/Archive: Gregory Grice |
|||
![]() |
![]() |
![]() |
|
| MOW welded rail train at Calverton siding 4/05/2025 - Photos/Archive: Norman Nemec | |||
![]() |
![]() |
This is a rail recovery train which was apparently acquired for initial use on the rebuilding of the East End of the Main line a few years ago. Cars 6201-6210 are gondolas with medium height walls that are used to carry rail recovered during rebuilding projects. They do not appear to have any ends. Car 6211 is the designated carrier for the crawler crane used with this outfit. This J. I. Case crane can move from car to car on its crawler treads. The car is a very low sided gondola. Cars 6201-6210 and 6211 were built in January 2024 by the Williams-Hayward Thermal Bond Company according to the lettering on the car sides. The rail recovery train was photographed in Riverhead in March 2024 by Ed Koehler. Article: LIST-NRHS Semaphore February 2025 |
|
![]() FTSX #400024 welded rail car -Belmont Yard 7/14/2025 Photo/Archive: Chris Kokonis |
![]() FTSX #400023 welded rail car -Belmont Yard 7/14/2025 Photo/Archive: Chris Kokonis |
||
|
|
|||
|
The LIRR uses the Garden City
Mitchel Secondary to store equipment for MOW trains, very special occasions
as the BNSF OSC train for the Rider Cup, and famously used this line to
store the Circus train, until 2017, when at the Nassau Coliseum. As there are no lights or gates at any grade crossing along this line the train crew must flag each one as a number of these crossings are very busy. MP15AC #160 MOW rail recovery 65' Ebenezer open ends gondola train heads west on September 9th, 2026. All Photos/Archive: Eric Kerper |
|||
![]() MP15AC #160 heads west with rail recovery gondola train crossing Selfridge Ave. 9/19/2026 |
![]() A Case backhoe used in discard rail pickup brings up the train rear gon. 9/19/2026 |
![]() Here we see the gon train crossing Roosevelt Ave. View south. 9/19/2026 |
![]() Having crossed Roosevelt Ave., view SW, the ex-Circus train storage is at the right. 9/19/2026 |
![]() Approaching Clinton Ave, the conductor/brakeman are preparing to flag the crossing. 9/19/2026 |
![]() Crossing Clinton Ave traveling westbound. View NE - 9/19/2026 |
||
|
|
|||
| MAIN LINE WELDED RAIL PROJECT | |||
![]() MOW -MP15AC #151 train westbound, west of Edwards Ave in Calverton. |
![]() Westbound Ebenezer 65' Gondolas in Action |
![]() Used ties, fishplates, joint bars, and scrap |
![]() Ebenezer 65' #6212 Open End Gondola |
|
All Photos/Archive: Calverton 10/31/2026 |
![]() There must be a few thousand feet of old rail lying on the north side of the mainline, west of Edwards Ave in Calverton. |
![]() LIRR TC-033 - Plasser American 09-16 UNIMAT-4S is a continuous-action production and switch tamping machine, and the BDS-100 is a companion ballast distribution and profiling system. |
|
|
|
|||
![]() LI #3206 Plasser American Ballast Distribution System designed with a built-in conveyor belt that makes loading and unloading easier at Belmont Yard 7/2025 - Photo/Archive: Chris Kokonis |
![]() New 115 pound rail replacing 100 pound rail on the LIRR Main Line at Milepost 63. Info/Photo/Archive: John Krattinger |
![]() A study of welded rail on the Montauk Branch near Canoe Place, South rail is 119 pound rail rolled in February 1979 at Bethlehem Steel's Steelton, PA plant and was installed as part of the massive rebuild of the Montauk Branch east of Speonk. The north rail which sees more wear was since replaced with ArcelorMittal 115 pound rail rolled in October 2007. Info/Photo/Archive: John Krattinger |
|