Welded Rail Trains


On the Central Branch, the 159 and 155 are tied down for the weekend with an Amtrak welded rail train.  Seen on the east end of Wellwood Double-End
Freight siding in North Lindenhurst, the train will go to work following Monday morning's commission hour.  August, 1987

 Info/Photo/Archive: Jay Bendersky

  Welded rail train eastward thru Hicksville Station, Track 3, with Ol' Glories MP15ACs 150/158
doing the honors..."SERVING WITH PRIDE"!! - 11/20/2019  Photo/Archive: Paul Pesante
 
The Rail train transports Continuous Welded Rail segments.  Today's job is to creep along the Central Branch at walking pace while the puller runs the rail off the rack and the track crew spikes the ribbons in place.  Keep up a good pace otherwise its extra work to set up for the next crew which is the Track Laying Machine.  Info/Photos/Archive: Jason Baxter - 8/12/2020

Welded Rail Train preparing to stop at Queens Interlocking while an eastbound M7 crosses over at Floral Park. 3/27/2021
Photo/Archive: Craig Lignelli
 
Today's rail train eastbound with NYAR GP38-2 #261 and MP15AC #159 power
passing Mineola station.   4/17/2021  - Photos/Archive: Thomas Farmer
 

Day 2 of the RS90 working the Rail Train, this time between Mineola and Hicksville.
Ellison Ave. bridge, Westbury (left) - RS90 eastbound passing Carle Place
 4/18/2021 - Photo/Archive: Daniel Foran
LIRR #152 sitting on the Wellwood DEF (double-ended freight track) with the welded rail train, waiting for a crew to take the train west.  9/02/202
Photo/Archive: Daniel Foran
MP15AC #150 with three MP15AC units train "tied up" at Wellwood siding with a welded rail train 4/02/2026 - Photo/Archive: Eric Kerper
   
Single Tracking For Rails.  A pair of MTA LIRR Trains pass the Rail Train near Bayside, NY on Saturday, 5/22/2021.  The rail train was dropping welded rail between Little Neck and Bayside as part of ongoing work projects on the Port Washington Branch.  By using welded rail, the need for maintenance is significantly reduced and the ride is much smoother.  Info/Photos/Archive:  Marc Glucksman - River Rail Photo    

View east along Track 1. In the foreground, this was old Track 2. 5/21/2022 - Photo/Archive: Jeff Erlitz


LIRR Main Line "Cut-and-Throw" weekend #2, in New Cassel, between Westbury and Hicksville. As of 1:00pm this afternoon.  Track 1 has already been thrown over and is reconnected.  Final tamping, lining, surfacing, installation of third rail and testing of track circuits still need to be done.  On the right, where the welded rail is piled, is where new Track 2 will be installed over the next month or so.  Jeff Erlitz


Rolling new welded rail into place at Mineola this morning. 7/11/2022 -
Photo/Archive: John Krattinger
 


New Ebenezer Drop Ends 65' gondola #6208
2/2024 - Photo/Archive: Barry Johnson

New Ebenezer Drop Ends 65' gondola #6205
2/2024 - Photo/Archive: Barry Johnson

The #166 sits uncoupled from a train of brand new open-end gondolas, #6205, brought out to AH in advance of trackwork on the mainline in Calverton. 3/03/2024 - Photo/Archive: Ronnie Schnepf

MP15AC #165 at RMLI, Riverhead rail reclaim 3/28/2024 Photo/Archive: Daniel Foran

MP15AC #165 with rail train pulling into Riverhead. 3/23/2024 Photos/Archive: Kenny Reichel

Backing down the freight line 3/23/2024

Welded rail train passing Jamaica  11/04/2024 Photo/Archive: Leonard Wilson

MP15AC #163, #160 MOW eastbound on Track 1, Mineola - 7/26/2024
Photo/Archive: John Ciesla


Port Jefferson - MOW re-railing operation 12/24/2024 Photo/Archive: Antonio Morrow

On a foggy March 31st, 2025, Long Island Rail Road Extra 172, with MP15AC 172, towed a short gondola rail train from MO (Moriches) to Holban Yard via the Montauk Line.  Here the westbound train is crossing the Forge River.  Later, further west passing West Islip and, at right, approaching Lynbrook station.
Photo/Archive: Gregory Grice 

 
 
MOW welded rail train at Calverton siding 4/05/2025 - Photos/Archive: Norman Nemec  

This is a rail recovery train which was apparently acquired for initial use on the rebuilding of the East End of the Main line a few years ago.  Cars 6201-6210 are gondolas with medium height walls that are used to carry rail recovered during rebuilding projects.  They do not appear to have any ends. Car 6211 is the designated carrier for the crawler crane used with this outfit. This J. I. Case crane can move from car to car on its crawler treads. The car is a very low sided gondola.

Cars 6201-6210 and 6211 were built in January 2024 by the Williams-Hayward Thermal Bond Company according to the lettering on the car sides.  The rail recovery train was photographed in Riverhead in March 2024 by Ed Koehler.  Article:  LIST-NRHS Semaphore February 2025

 
FTSX #400024 welded rail car -Belmont Yard
7/14/2025 Photo/Archive: Chris Kokonis

FTSX #400023 welded rail car -Belmont Yard
7/14/2025 Photo/Archive: Chris Kokonis
 

The LIRR uses the Garden City Mitchel Secondary to store equipment for MOW trains, very special occasions as the BNSF OSC train for the Rider Cup, and famously used this line to store the
Circus train, until 2017, when at the Nassau Coliseum.  As there are no lights or gates at any grade crossing along this line the train crew must flag each one as a number of these crossings are very busy.

MP15AC #160 MOW rail recovery 65' Ebenezer open ends gondola train heads west on September 9th, 2026. All Photos/Archive: Eric Kerper


MP15AC #160 heads west with rail recovery gondola train crossing Selfridge Ave. 9/19/2026

A Case backhoe used in discard rail pickup brings
up the train rear gon.   9/19/2026

Here we see the gon train crossing Roosevelt Ave. View south.   9/19/2026

Having crossed Roosevelt Ave., view SW, the ex-Circus train storage is at the right.  9/19/2026
 
Approaching Clinton Ave, the conductor/brakeman are preparing to flag the crossing.   9/19/2026

Crossing Clinton Ave traveling westbound.
View NE -  9/19/2026
 

  MAIN LINE WELDED RAIL PROJECT  

MOW -MP15AC #151 train westbound, west of Edwards Ave in Calverton.

Westbound Ebenezer 65' Gondolas in Action

Used ties, fishplates, joint bars, and scrap

Ebenezer 65' #6212 Open End Gondola
 

 

All Photos/Archive: Calverton 10/31/2026
Steve Rothaug


There must be a few thousand feet of old rail lying on the north side of the mainline, west of Edwards Ave in Calverton.

LIRR TC-033 - Plasser American 09-16 UNIMAT-4S is a continuous-action production and switch tamping machine, and the BDS-100 is a companion ballast distribution and profiling system.
 


LI #3206 Plasser American Ballast Distribution System designed with a built-in conveyor belt that makes loading and unloading easier at Belmont Yard
7/2025 - Photo/Archive: Chris Kokonis

New 115 pound rail replacing 100 pound rail on the LIRR Main Line at Milepost 63.
Info/Photo/Archive: John Krattinger

A study of welded rail on the Montauk Branch near Canoe Place, South rail is 119 pound rail rolled in February 1979 at Bethlehem Steel's Steelton, PA plant and was installed as part of the massive rebuild of the Montauk Branch east of Speonk.  The north rail which sees more wear was since replaced with ArcelorMittal 115 pound rail rolled in October 2007. Info/Photo/Archive: John Krattinger
 